SEARCH AGILITY R&C



    This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

    CDM Assistance

    The Construction (Design and Management) Regulations 2015 (CDM 2015) came into force in Great Britain on 6th April 2015. They set out what people involved in construction work need to do to protect themselves from harm and anyone the work affects. The HSE has produced guidance on the regulations, managing health and safety in construction L153.

    Key elements to securing construction health and safety:

    • Managing the risks by applying the general principles of prevention.
    • Appointing the right people and organisations at the right time.
    • Making sure everyone has the information, instruction, training and supervision they need.
    • Duty holders cooperating and communicating with each other.
    • Consulting workers and engaging with them to promote and develop effective measures.

    Other health and safety regulations also apply to construction. For example, the Work at Height Regulations 2005 and the Control of Asbestos Regulations 2012 (see here for more information).

    CDM Assistance Agility RAC
    Worker in protective uniform in front of wooden pallets

    Construction Phase Plans

    Regulation twelve of the Construction (Design Management) regulations 2015 states that During the pre-construction phase, and before setting up a construction site, the principal contractor must draw up a construction phase plan or make arrangements for a construction phase plan...

    View page

    Applying for F10

    It is the Clients responsibility to notify a construction project but in practice it may be other duty holders such as the Principal contractor. If the client is a: Commercial client, then they must notify Health and safety Executive (HSE)...

    View page
    Hard hats in a row hanging on a rail on a building site
    Shot of two warehouse workers talking together over a clipboard while standing inside of a large warehouse

    CDM Site Inspections

    To ensure compliance with Health & Safety and CDM regulations inspections are necessary. The Construction (Design and Management) Regulations 2015 (CDM 2015) come into force in Great Britain on 6 April 2015. They set out what people involved in construction...

    View page

    Site Setup

    The construction phase plan (PDF) must set out the health and safety arrangements and site rules during the period construction work is carried out and suitable site inductions must be provided. What you need to know All construction sites require: Site rules Site...

    View page
    Construction Site and Buildings in London at Sunset

    Contact Agility R&C

    Agility Risk & Compliance Ltd provide tailored solutions to mitigate risk and improve compliance in Health and Safety, HR, Training, and Occupational Health.

    If you have an enquiry please call us on 01527 571611 or email us on info@agilityrac.com.

    Existing clients call our 24-hour service and you will be directed to your expert consultant.

      This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.